Motorists are advised that to facilitate power supply works, the overnight buses and coaches parking spaces at the northern kerbside lane of Chun Ying Street, Tseung Kwan O from a point about 6 meters east of its junction with Chun Choi Street to a point of about 75 meters east of the same junction will be temporarily relocated to the southern kerbside lane of Chun Ying Street from a point about 34 meters east of its junction with Chun Kwong Street to a point about 100 meters east of the same junction from 8:00 a.m. on 15 September 2026 to 8:00 a.m. on 30 December 2026.
Appropriate traffic signs will be erected to guide motorists.