Traffic Advice

Temporary Traffic Arrangements on Chatham Road North, Hung Hom

  Motorists are advised that in connection with the construction of Shatin to Central Link, the following temporary traffic arrangements will be implemented from 1.00 a.m. to 5.30 a.m. on 23 August 2014:

(a) The 2nd left lane of Chatham Road North northbound from its junction with the egress of Hong Kong Polytechnic University Phase 8 to a point about 100 metres north of the same junction will be closed; and
(b) One traffic lane of the slip road leading from Chatham Road North northbound to Hong Chong Road southbound will be closed and the remaining one lane will be maintained for vehicles heading for Hong Chong Road and Princess Margaret Road Link.

  Appropriate traffic signs will be set up on site to guide motorists.