Traffic Advice

Temporary banning of right turn movements for all vehicles exceeding 6 metres in length from Ma Hang Chung Road westbound onto Pak Tai Street

 Motorists are advised that in connection with the construction of Shatin to Central Link, the right turn movements for all vehicles exceeding 6 metres in length from Ma Hang Chung Road westbound onto Pak Tai Street will be temporarily banned from 10.00 a.m. on 15 October 2014 to 6 November 2014.

 Affected vehicles are advised to travel via Ma Hang Chung Road westbound, Tin Kwong Road westbound, Farm Road eastbound, Ma Tau Wai Road southbound and Pak Tai Street.

 Appropriate traffic signs will be set up on site to guide motorists.