Traffic Advice

Temporary Traffic Arrangements in Hung Hom

Motorists are advised that in connection with the construction of Shatin to Central Link, the following temporary traffic arrangements will be implemented from 1am to 6am on 28 September and 5 October 2014:

(a) One traffic lane of Gascoigne Road Flyover eastbound near Hong Kong Girl Guides Association Headquarters will be intermittently closed;
(b) Two traffic lanes of the section of Chatham Road South eastbound between Hong Chong Road and Gascoigne Road will be intermittently closed; and
(c) One traffic lane of Chatham Road North eastbound from its junction with Chatham Road South eastbound to a point about 350 metres east of the same junction will be intermittently closed.

Appropriate traffic signs will be set up on site to guide motorists.