Traffic Advice
Temporary Traffic Arrangement on Shatin Pass Road, Wong Tai Sin
Motorists are advised that to facilitate slope remedial works, the following traffic arrangement will be implemented on Shatin Pass Road from 9.00 am to 5.00 pm daily on every Mondays to Fridays during the period from 7 October 2014 to 6 May 2015:-
- (a) The section of Shatin Pass Road between Lion Pavilion and Kwun Yam Shan Tsuen will be temporarily closed;
- (b) the section of Shatin Pass Road between Fat Chong Temple and Lion Pavilion will be converted to one lane two way traffic with manual operated Stop/Go signs; and
- (c) the section of Shatin Pass Road between Kwun Yam Shan Tsuen and the junction with Jat's Incline will be converted to one lane two way traffic with manual operated Stop/Go signs.
Appropriate traffic signs will be erected to guide motorists.