Traffic Advice

Temporary Traffic Arrangement on Cheong Wan Road, Hung Hom

      Motorists are advised that in connection with the construction of Shatin to Central Link, the middle and fast lanes of Cheong Wan Road westbound near Hong Kong Coliseum may be temporarily closed between 1.30am to 5am, from 1 March 2015 to 31 May 2015, depending on the progress of works.

      Appropriate traffic signs will be set up on site to guide motorists.