Traffic Advice

Temporary Traffic and Transport Arrangement in Tsz Wan Shan

         Members of the public are advised that in connection with the construction of Shatin to Central Link, the following temporary traffic and transport arrangements will be implemented in Tsz Wan Shan from 09:00 a.m. to 07:00 p.m. daily from 3 October 2016 to 30 September 2017:

A. Temporary Road Closure

         The traffic lane of Wan Wah Street (southbound) south of Sheung Fung Street will be temporarily closed to all vehicular traffic.

B. Traffic Diversions

         Affected vehicles on Wan Wah Street (southbound) heading for Shung Wah Street and Wan Wah Street southbound south of Yuk Wah Street will be temporarily diverted via Sheung Fung Street (westbound), Shung Wah Street (eastbound), Po Kong Village Road (eastbound), Tsz Wan Shan Road (northbound), Yuk Wah Street (westbound) and Wan Wah Street (southbound).

         Appropriate traffic signs will be provided on site to guide motorists.