TRANSPORT DEPARTMENT NOTICE

TEMPORARY TRAFFIC AND TRANSPORT ARRANGEMENTS IN JORDAN

     Notice is hereby given that for the construction of Guangzhou-Shenzhen-Hong Kong Express Rail Link, the section of Lin Cheung Road between Jordan Road and Civil Aid Service Headquarter will be temporarily closed to all vehicular traffic from 2.00 a.m. to 6.00 a.m. daily on 10 and 11 December 2016.

     During the above road closure period, the following temporary traffic and transport arrangements will be implemented:

     (I) Temporary Traffic Diversions

     (a) Vehicles from Jordan Road (eastbound) heading for Kwai Chung and Lantau will be temporarily diverted to travel via Jordan Road (eastbound), Road D1A(S) (southbound), Wui Cheung Road (eastbound), Canton Road (northbound), Jordan Road (westbound), Hoi Po Road (northbound) and Lin Cheung Road (northbound).
     (b) Vehicles from Jordan Road (eastbound) heading for Hong Kong will be temporarily diverted to travel via Jordan Road (eastbound), Ferry Street (northbound), Yan Cheung Road (westbound), Hoi Wang Road (northbound), slip road and West Kowloon Highway (southbound).
     (c) Vehicles from Jordan Road (westbound) heading for Kwai Chung and Lantau will be temporarily diverted to travel via Jordan Road (westbound), Hoi Po Road (northbound) and Lin Cheung Road (northbound).
     (d) Vehicles from Jordan Road (westbound) heading for Hong Kong will be temporarily diverted to travel via Jordan Road (westbound), roundabout, Jordan Road (eastbound), Ferry Street (northbound), Yan Cheung Road (westbound), Hoi Wang Road (northbound), slip road and West Kowloon Highway (southbound).

     (II) Temporary Public Transport Arrangements

     (a) Citybus route nos. E23 and N11 from Jordan Road (westbound) heading for Lantau will be temporarily diverted to travel via Jordan Road (westbound), Hoi Po Road (northbound) and Lin Cheung Road (northbound) before resuming its normal routeing on West Kowloon Highway (northbound).
     (b) New World First Bus route no. 970X from Jordan Road (westbound) heading for Hong Kong will be temporarily diverted to travel via Jordan Road (westbound), roundabout, Jordan Road (eastbound), Ferry Street (northbound), Yan Cheung Road (westbound), Hoi Wang Road (northbound) and slip road before resuming its normal routeing on West Kowloon Highway (southbound).

     Actual implementation of the traffic arrangement and traffic control will be made by the police depending on the traffic condition in the area.  Appropriate traffic signs will be erected on site to guide motorists. Motorists should exercise tolerance and patience in case of traffic congestion, and observe the instructions given by the police. 

YEUNG HO Poi-yan, Ingrid Commissioner for Transport