Traffic Advice

Traffic Arrangements in Hung Hom

     Motorists are advised that in connection with the construction of Shatin to Central Link, the following traffic arrangement will be implemented in Hung Hom at 4.00 p.m. on 30 December 2016:

(a) The section of Chatham Road North between Winslow Street and Wa Fung Street will be re-opened.
(b) The section of Chatham Road North between Wa Fung Street and Baker Street will be resumed to one-way eastbound traffic.

     Appropriate traffic signs will be set up on site to guide motorists.