Traffic Advice
Temporary Traffic Arrangement on Tsing Sha Highway
Motorists are advised that to facilitate road resurfacing works, the following temporary traffic arrangement will be implemented on Tsing Sha Highway on 24 and 27 February 2017 and 1 March 2017:
(i) From 10.00 pm to 6.00 am on the following day
The middle lane and fast lane of Tsing Sha Highway from the tunnel tube exit of Eagle's Nest Tunnel westbound to a point about 1,000 metres west of the tunnel tube exit will be closed to all vehicular traffic.
Appropriate traffic signs will be erected on site to guide motorists.