Traffic Advice

Temporary Traffic Arrangements in Tsz Wan Shan

     Members of the public are advised that in connection with the construction of Shatin to Central Link, the following temporary traffic arrangements will be implemented in Tsz Wan Shan from 01.30 am to 05.00 am from 1 April 2017 to 8 April 2017:

A. Temporary Road Closure

The following road sections will be temporarily closed to all vehicular traffic:

i. The traffic lane of Tsz Wan Shan Road (westbound) west of Wai Wah Street;

ii. The traffic lane of Wai Wah Street (eastbound) east of Wan Wah Street; and

iii. The traffic lane of Wan Wah Street (southbound) south of Tsz Wan Shan Road.

B. Banning of right-turn vehicular movements

i. All vehicles will be temporarily banned from making right turn movements from Tsz Wan Shan (Central) Bus Terminus onto Wai Wah Street (eastbound);

ii. All vehicles will be temporarily banned from making right turn movements from Tsz Oi Estate Carpark onto Wan Wah Street (southbound);

iii. All vehicles will be temporarily banned from making right turn movements from Ching Fai Street (southbound) onto Tsz Wan Shan Road (westbound); and

iv. All vehicles will be temporarily banned from making right turn movements from Tsz Wan Shan Road (eastbound) onto Wan Wah Street (southbound).

C. Traffic Diversions

i. Affected vehicles on Tsz Wan Shan Road (eastbound) heading for Wan Wah Street will be diverted via Tsz Wan Shan Road (eastbound), Wai Wah Street (westbound) and Wan Wah Street (northbound);

ii. Affected vehicles on Tsz Wan Shan Road (westbound) heading for Ching Fai Street will be diverted via Wai Wah Street (westbound), Wan Wah Street (northbound) and Tsz Wan Shan Road (eastbound); and

iii. Affected vehicles on Wan Wah Street (northbound) heading for Wai Wah Street will be diverted via Wan Wah Street (northbound), Tsz Wan Shan Road (eastbound) and Wai Wah Street (westbound).

     Appropriate traffic signs will be provided on site to guide motorists.