New Arrangement of Closed Road Permit for Cross-boundary Vehicles for Commissioning of Huanggang Port

The Huanggang Port commissions at 6:30 am of 12 October 2026. This department implements following new arrangements of closed road permit for cross-boundary vehicles ("CRP") starting from the same day ("the effective date") to streamline administrative procedures.

a. Cross-boundary vehicles between Guangdong and Hong Kong (to Huanggang Port) with CRP of Lok Ma Chau Boundary Control Point issued before the effective date

b. Cross-boundary private cars and goods vehicles between Guangdong and Hong Kong (to Passageway No.1 of Futian Free Trade Zone) with CRP of Lok Ma Chau Boundary Control Point issued before the effective date

c.(i) Cross-boundary private cars between Guangdong and Hong Kong with CRP of Man Kam To / Sha Tau Kok / Heung Yuen Wai Boundary Control Point issued before the effective date

  (ii) Cross-boundary private cars between Guangdong and Hong Kong with CRP of Shenzhen Bay Port issued before the effective date

d. (i) Cross-boundary hire cars between Guangdong and Hong Kong with CRP of Man Kam To / Sha Tau Kok / Heung Yuen Wai Boundary Control Point issued before the effective date

  (ii) Cross-boundary hire cars between Guangdong and Hong Kong with CRP of Shenzhen Bay Port issued before the effective date

  (iii) Cross-boundary hire cars between Guangdong and Hong Kong with CRP of Hong Kong-Zhuhai-Macao Bridge Port issued before the effective date


e. Cross-boundary buses between Guangdong and Hong Kong with CRP of Hong Kong-Zhuhai-Macao Bridge Port issued before the effective date


CRP holders are not required to apply for amendment of CRP until the expiry of the existing CRP. This Department will revise the relevant crossing endorsement of boundary control point / port when processing renewal, change of vehicle / change in driver particular applications.

Cross-boundary Unit
Transport Department
October 2026