Traffic Advice

Temporary Traffic Arrangements at
Aberdeen Tunnel and Wong Nai Chung Gap Flyover

        Motorists are advised that to facilitate the road works, the following temporary traffic arrangements will be implemented in Aberdeen Tunnel and Wong Nai Chung Gap Flyover  during the periods specified below:

 

Period

Temporary Traffic Arrangements

From 10.00 pm to 1.00 am of the following day

on 21 - 24 August 2017

(Monday to Thursday) daily

1. The fast lane of Aberdeen Tunnel Wan Chai bound tunnel tube will be closed temporarily to all vehicular traffic; and

2. The fast lane of Wong Nai Chung Gap Flyover northbound from the Wan Chai exit of Aberdeen Tunnel to a point about 250 metres north of the exit will be closed temporarily to all vehicular traffic.

From 1.00 am to 5.00 am

on 22 - 25 August 2017

(Tuesday to Friday) daily

1. All lanes of Aberdeen Tunnel Wong Chuk Hang bound tunnel tube will be closed to all vehicular traffic. One-tube two-way will be implemented at the Wan Chai bound tunnel tube; and

2. The fast lane of Wong Nai Chung Gap Flyover northbound from a point about 50 metres north of the Wan Chai exit of Aberdeen Tunnel to a point about 250 metres north of the exit will be closed temporarily to all vehicular traffic.

From 10.00 pm to 5.00 am of the following day

on 28 - 30 August 2017

(Monday to Wednesday) daily

1. The fast lane of Aberdeen Tunnel Wan Chai bound tunnel tube will be closed temporarily to all vehicular traffic; and

2. The slow lane of Wong Nai Chung Gap Flyover northbound from a point about 50 metres north of the Wan Chai exit of Aberdeen Tunnel to a point about 250 metres north of the exit will be closed temporarily to all vehicular traffic.

 

        Appropriate traffic signs will be erected on site to guide motorists.