Traffic Advice

Temporary Traffic Arrangements at Tseung Kwan O Tunnel

         Motorists are advised that to facilitate the technical assessment of systems in Tseung Kwan O Tunnel, the following temporary traffic arrangements will be implemented in Tseung Kwan O Tunnel.

Date

Time

Closure of Tunnel Tube

2 May 2018

(Wednesday)

00.30 a.m.

to

5.30 a.m.

The Tseung Kwan O bound tunnel tube of Tseung Kwan O Tunnel will be closed; and one-tube-two-way operation will be implemented in the Kwun Tong bound tunnel tube.

3 May 2018

(Thursday)

The Kwun Tong bound tunnel tube of Tseung Kwan O Tunnel will be closed; and one-tube-two-way operation will be implemented in the Tseung Kwan O bound tunnel tube.

        During implementation of the above temporary tube closures and one-tube-two-way arrangements, the speed limit of Tseung Kwan O Tunnel will be reduced from 70 kilometres per hour to 50 kilometres per hour.

        Motorists are advised to drive with care and patience.  Appropriate traffic signs will be erected on site to guide motorists.