Transport Department Notice

Temporary Traffic Arrangement at the Eastern Harbour Crossing

        Notice is hereby given that to facilitate road repair works, part of the slow lane of the road section leading from the Hong Kong exit of the Eastern Harbour Crossing to North Point will be temporarily closed to all vehicular traffic from 9.00 pm to 9.00 am of the following day on 23 February 2019 (Saturday).  Motorists could still use the remaining traffic lane heading for North Point.

        During the implementation of the above temporary traffic arrangement, the speed limit of the Eastern Harbour Crossing (Hong Kong bound) will be temporarily reduced from 70 kilometres per hour to 50 kilometres per hour.

        The Transport Department anticipates that the traffic in the vicinity of the Eastern Harbour Crossing (Hong Kong bound) will be relatively busy during the above period. Motorists passing through the affected road section are advised to be patient and drive with utmost care, and watch out for the latest traffic news through the media. Early planning of journeys to allow more travelling time is also advised to avoid unexpected delay.

        Appropriate traffic signs will be erected on site to guide motorists.

CHAN Mable Commissioner for Transport