TRAFFIC ADVICE

Temporary Traffic Arrangements on Expo Drive, Wan Chai North

        Members of the public are advised that to facilitate the road works of Wan Chai Development Phase II, the following temporary traffic arrangements will be implemented from 9.00 pm to 6.00 am daily during the period from 2 to 4 July 2019 and 8 to 11 July 2019:

(a)   Road Closure

The section of Expo Drive from its junction with Lung Wo Road eastbound to a point about 350 metres east of the same junction will be temporarily closed to all vehicular traffic.

(b)   Traffic Diversion

Affected vehicles on Expo Drive eastbound heading for Expo Drive Central will be diverted via Expo Drive eastbound.

        Appropriate traffic signs will be erected on site to guide motorists.