Transport Department Notice

Temporary Traffic Arrangements on Heung Yuen Wai Highway, North District

        Notice is hereby given that in order to facilitate the Heung Yuen Wai Highway Running Event, the following temporary traffic and transport arrangements will be implemented:

I.   Road Closure

The following road sections will be temporarily closed to all vehicular traffic:

From 00.00 am to 01.59 am on 27 October 2019 (Sunday)

1.  The section of Heung Yuen Wai Highway between Sha Tau Kok Road Interchange and Lin Ma Hang Road Interchange, including Cheung Shan Tunnel;

2.  The slip road connecting from Sha Tau Kok Road Interchange to Heung Yuen Wai Highway northbound;

3.  The slip road connecting from Heung Yuen Wai Highway southbound to Sha Tau Kok Road Interchange;

4.  The slip roads connecting Ping Yeung Interchange and Heung Yuen Wai Highway;

5.  The slip roads connecting Lin Ma Hang Road Interchange and Heung Yuen Wai Highway; and

6.  Lin Ma Hang Road Interchange.

From 02.00 am to 02.00 pm on 27 October 2019 (Sunday)

1.  Heung Yuen Wai Highway, including Lung Shan Tunnel and Cheung Shan Tunnel;

2.  The slip roads connecting Fanling Highway and Heung Yuen Wai Highway;

3.  The slip roads connecting Sha Tau Kok Road Interchange and Heung Yuen Wai Highway;

4.  The slip roads connecting Ping Yeung Interchange and Heung Yuen Wai Highway;

5.  The slip roads connecting Lin Ma Hang Road Interchange and Heung Yuen Wai Highway; and

6.  Lin Ma Hang Road Interchange.

II.   Traffic Diversion

From 00.00 am to 01.59 am on 27 October 2019 (Sunday)

1.  Vehicles on Lung Shan Tunnel northbound heading for Ping Yeung and Lin Ma Hang will be diverted via Sha Tau Kok Road Interchange, Sha Tau Kok Road westbound and Ping Che Road northbound;

2.  Vehicles on Lin Ma Hang Road southbound heading for Kowloon will be diverted Lin Ma Hang Road southbound, Ping Che Road southbound, Sha Tau Kok Road westbound, Jockey Club Road southbound, slip road and Fanling Highway southbound; and

3.  Vehicles from Ping Yeung heading for Kowloon will be diverted Ping Yuen Road westbound, Ping Che Road southbound, Sha Tau Kok Road westbound, Jockey Club Road southbound, slip road and Fanling Highway southbound.

From 02.00 am to 02.00 pm on 27 October 2019 (Sunday)

1.  Vehicles on Fanling Highway northbound heading for Sha Tau Kok, Ping Yeung and Lin Ma Hang will be diverted via Fanling Highway northbound, slip road (exit 7C), Pak Wo Road northbound, Jockey Club Road northbound and Sha Tau Kok Road eastbound;

2.  Vehicles on Fanling Highway southbound heading for Sha Tau Kok, Ping Yeung and Lin Ma Hang will be diverted via Fanling Highway southbound, So Kwun Po Road roundabout, So Kwun Po Road eastbound, Ma Sik Road eastbound and Sha Tau Kok Road eastbound;

3.  Vehicles on Lin Ma Hang Road southbound heading for Kowloon will be diverted Lin Ma Hang Road southbound, Ping Che Road southbound, Sha Tau Kok Road westbound, Jockey Club Road southbound, slip road and Fanling Highway southbound;

4.  Vehicles from Ping Yeung heading for Kowloon will be diverted Ping Yuen Road westbound, Ping Che Road southbound, Sha Tau Kok Road westbound, Jockey Club Road southbound, slip road and Fanling Highway southbound; and

5.  Vehicles on Sha Tau Kok Road westbound heading for Kowloon will be diverted Sha Tau Kok Road westbound, Jockey Club Road southbound, slip road and Fanling Highway southbound.

        Appropriate temporary traffic signs will be erected to guide motorists. Motorists are reminded to observe the instruction of the Police on site.

CHAN Mable Commissioner for Transport