Traffic Advice

Temporary Closure of Cycle Track/Footway between
Bicycle Park at Hang Tai Road and A Kung Kok Street, Sha Tin

        Cyclists are advised that in order to facilitate the relocation works of Sha Tin Sewage Treatment Works, a section of cycle track/footway between Bicycle Park at Hang Tai Road and A Kung Kok Street will be temporary closed from 10.00 am on 15 January 2020 to 6.00 pm on 28 December 2021.

        Cyclists and pedestrians may use the temporary cycle track/footway between the junction of Hang Tai Road and Ling Tai Road outside Sheng Kung Hui Ma On Shan Holy Spirit Primary School and A Kung Kok Street during the above-mentioned period.

        Appropriate traffic signs will be erected on site to guide the cyclists and pedestrians.