TRAFFIC ADVICE

Temporary Traffic and Transport Arrangements on Kwun Tong Road, Kwun Tong

        Motorists are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Kwun Tong Road with effect from 10.00 pm on 20 June 2020 to 9.00 am of the following day.

Traffic Arrangements

(a)  Road Closure

i.  A section of the fourth and fifth lane of Kwun Tong Road westbound (from near Kowloon Bay St. John The Baptist Catholic Primary School to near Kai Ning House) will be temporarily closed; and

ii.  A section of slow lane of Wai Yip Street flyover (near Kowloon Bay St. John The Baptist Catholic Primary School) connecting with Kwun Tong Road westbound will be temporarily closed.

(b)  Traffic Diversion

Affected vehicles on Kwun Tong Road westbound heading to Lung Cheung Road westbound will be diverted via Kwun Tong Road westbound, Choi Hung Interchange flyover to Lung Cheung Road westbound.

Public Transport Arrangements

CTB route nos. E22A (AsiaWorld-Expo bound), A29 (Airport bound) and NA29 (Airport bound) will be diverted via Kwun Tong Road westbound, Choi Hung Interchange flyover and Lung Cheung Road westbound before resuming its original routings.

New Territories GMB route nos. 102 (San Po Kong bound), 102B (Choi Hung bound) and 102S (San Po Kong bound) will be diverted via Kwun Tong Road westbound, Choi Hung Interchange flyover and Lung Cheung Road westbound before resuming its original routings.

        Appropriate traffic signs will be erected to guide motorists. The public transport operator will display notices to inform passengers of the above temporary transport arrangements.