TRAFFIC ADVICE

Extension of Temporary Traffic Arrangement on Hong Ning Road, Kwun Tong

        Motorists are advised that in order to facilitate drainage works, with effect from 3.01 pm on 2 September 2020 to 11.59 pm on 9 December 2020, the following temporary traffic arrangements will continue be temporarily implemented on Hong Ning Road:-

i.   A section of the fast lane on Hong Ning Road northbound(near Wo Hong Path) will be temporarily closed; and

ii.  A section of the slow lane on Hong Ning Road southbound(near Wo Hong Path) will be temporarily closed.

        Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions and drive with utmost care.