Traffic Advice

Temporary Traffic and Transport Arrangement on Kwai Tsing Road, Tsing Yi

      Members of the public are advised that to facilitate prestressing tendon maintenance works of Kwai Tsing Bridge, the following temporary traffic and transport arrangements will be implemented within Kwai Tsing District from 11.00 p.m. to 6.00 a.m. of the following day on 10 April 2021, from 11.00 p.m. to 7.00 a.m. of the following day on 17 April 2021 and from 11.00 p.m. to 6.00 a.m. of the following day on 24 April 2021.

(I)   Temporary Traffic Arrangement

A.   Road Closure

The slip road from Kwai Tsing Road (westbound) leading to Tsing Yi Heung Sze Wui Road (northbound) will be temporarily closed to all vehicular traffic.

B.   Traffic Diversion

Affected vehicles on Kwai Tsing Road (westbound) heading for Tsing Yi Heung Sze Wui Road (northbound) will be diverted to travel via Tsing Yi Interchange and Tsing Yi Heung Sze Wui Road (northbound).

(II)  Temporary Public Transport Services Arrangements

GMB route no. 88 (Tsing Yi Estate bound) and 88B (Greenfield Garden bound) will be diverted to travel via Tsing Yi Interchange before resuming its normal routing at Tsing Yi Heung Sze Wui Road (northbound).

      Motorists are advised to drive with utmost care and patience. Appropriate traffic signs will be erected to guide motorists. Notices will be displayed by the GMB operator to advise passengers of the above arrangements.