TRAFFIC ADVICE

Extension of Temporary Traffic Arrangements on Shung Shun Street, Kwun Tong

      Motorists are advised that to facilitate sewage construction works, the following traffic arrangements will continue to be temporarily implemented on Shung Shun Street with effect from 6.01 pm on 31 July 2021 to 6.00 pm on 31 August 2021:-

Traffic Arrangements

(a)   A section of Shung Shun Street eastbound (outside Canaryside) will be temporarily closed;

(b)   A section of the fast lane at Shung Shun Street westbound (outside Canaryside) will be temporarily closed; and

(c)   All vehicles will be temporarily prohibited from making right turn movements from Lei Yue Mun Path (northbound) onto Shung Shun Street eastbound.

Traffic Diversion

(a)   Affected vehicles on Lei Yue Mun Path (northbound) will be diverted via Shung Shun Street westbound, Sze Shan Street northbound, Sze Shan Street eastbound and Cha Kwo Ling Road southbound.

Public Transport Arrangements

(a)   The existing stop for KMB route no. 14X on Shung Shun Street eastbound (near Canaryside) will continue to be temporarily relocated about 90 metres westwards; and

(b)   The existing stop for GMB route nos. 24 and 24S on Shung Shun Street eastbound (near Canaryside) will continue to be temporarily relocated about 65 metres westwards.

      Appropriate traffic signs have been erected on site to guide motorists.