Motorists are advised that in order to facilitate road inspection and maintenance works, the following temporary traffic arrangements will be implemented during the periods specified below:
Road Closure Implementation Date and Time |
Temporary Traffic Arrangement |
From 8.00 pm on 17, 21, 24 and 28 January 2022 to 6.00 am of the following day |
The Zhuhai bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Hong Kong bound tunnel tube. |
From 8.00 pm on 19, 20, 26 and 27 January 2022 to 6.00 am of the following day |
The Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Zhuhai bound tunnel tube. |
Appropriate traffic signs will be erected on site to guide motorists.