TRAFFIC ADVICE
Temporary Traffic and Transport Arrangements on Kai Cheung Road, Kowloon Bay


        Motorists are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Kai Cheung Road with effect from 9:00 pm to 05:00 am of the following day on 24 and 25 January 2022:

Road Closure
From 9:00 pm on 24 January 2022 to 5:00 am on 25 January 2022
A section of Kai Cheung Road eastbound middle lane (from Wang Chiu Road to Wai Yip Street) will be temporarily closed.

From 9:00 pm on 25 January 2022 to 5:00 am on 26 January 2022
A section of Kai Cheung Road eastbound slow lane and slip road (from Wang Chiu Road to Wai Yip Street) will be temporarily closed.

Traffic Diversion
Affected vehicles on Kai Cheung Road eastbound heading to Choi Hung Interchange, Shatin and Sai Kung will be diverted via Kai Cheung Road eastbound, Wai Yip Street southbound, Siu Yip Street eastbound, Tai Yip Street southbound, Hong Tak Road eastbound, Kwun Tong Road westbound.

Public Transport Arrangements
I.   GMB Kowloon route nos. 110 (Kowloon City bound), 111 (San Po Kong bound) and 46 (Island Harbour view bound) will be diverted via Kai Cheung Road eastbound, Wai Yip Street southbound, Siu Yip Street eastbound, Tai Yip Street southbound, Hong Tak Road eastbound, Kwun Tong Road westbound before resuming its original routings; and

II.  KMB route nos. 15A (Tsz Wan Shan bound), 33 (Tsuen Wan West bound), 74A (Tai Wo bound), NWFB route no. 797 (San Po Kong bound), XHT route no. 107 (Wan Kwai bound) will be diverted via Kai Cheung Road eastbound, Ngau Tau Kok Road eastbound, Chun Wah eastbound, Access Road of Ngau Tau Kok Bus Terminus, Jordan Valley North Road westbound, Ngau Tau Kok Road westbound, Kwun Tong Road westbound before resuming its original routings.


        Appropriate traffic signs will be erected to guide motorists. The public transport operator will display notices to inform passengers of the above temporary transport arrangements.