Members of the public are advised that, to facilitate road works, the following sections of Tai Tam Road will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic from 10.00 am to 3.00 pm daily during the period from 23 May 2022 to 27 May 2022:
(i) The section of Tai Tam Road from a point about 25 metres south of its junction with Shek O Road to a point about 60 metres south of the same junction; and
(ii) The section of Tai Tam Road from a point about 380 metres south of its junction with Shek O Road to a point about 590 metres south of the same junction.
Appropriate traffic signs will be provided on site to guide motorist.