Traffic Advice
Temporary Traffic Arrangement at Scenic Hill Tunnel

        Motorists are advised that in order to facilitate road inspection and maintenance works, the following temporary traffic arrangements will be implemented during the periods specified below:

Road Closure Implementation Date and Time

Temporary Traffic Arrangement

From 11.00pm to 6.00 am of the following day on 22 June 2022

The Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Zhuhai bound tunnel tube.

From 11.00pm to 6.00 am of the following day on 23, 24 and 25 June 2022

The Zhuhai bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Hong Kong bound tunnel tube.

From 8.00pm to 6.00 am of the following day on 27 and 30 June 2022 and 2 July 2022

The Zhuhai bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Hong Kong bound tunnel tube.

From 8.00pm to 6.00 am of the following day on 29 June 2022

The Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Zhuhai bound tunnel tube.


        Appropriate traffic signs will be erected on site to guide motorists.