Motorists are advised that in order to facilitate road inspection and maintenance works, the following temporary traffic arrangements will be implemented during the periods specified below:
Road Closure Implementation Date and Time |
Temporary Traffic Arrangement |
From 9.00am to 6.00 pm daily on 29 and 30 September 2022 and 3, 5, 6, 7 and 8 October 2022 |
Fast lane and middle lane of Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic. |
From 9.00am to 5.00 pm on 28 September 2022 |
Fast lane and middle lane of Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic. |
Appropriate traffic signs will be erected on site to guide motorists.