TRANSPORT DEPARTMENT NOTICE
Temporary Traffic Arrangements on West Kowloon Highway, Tai Kok Tsui


        Notice is hereby given that to facilitate road works, the following traffic lanes will be temporarily closed to all vehicular traffic during the periods specified below:

(i)     From 11.00 p.m. to 6.00 a.m. on the following day from 12 December 2022 to 16 December 2022;
From 11.00 p.m. to 6.00 a.m. on the following day from 19 December 2022 to 23 December 2022 and
From 11.00 p.m. to 6.00 a.m. on the following day from 3 January 2023 to 6 January 2023

The slow lane of West Kowloon Highway southbound from a point about 300 meters north of its junction with Lai Cheung Road (near Hong Kong Red Cross Headquarters) to a point about 890 meters north of the same junction (near HSBC Centre).

(ii)    From 11.00 p.m. to 6.00 a.m. on the following day from 9 January 2023 to 13 January 2023;
From 11.00 p.m. to 6.00 a.m. on the following day from 16 January 2023 to 20 January 2023 and
From 11.00 p.m. to 6.00 a.m. on the following day from 30 January 2023 to 3 February 2023

The slow lane of West Kowloon Highway southbound from a point about 365 meters north of its junction with Lai Cheung Road (near Olympian City Two) to a point about 890 meters north of the same junction (near HSBC Centre).

(iii)   From 11.00 p.m. to 6.00 a.m. on the following day from 6 February 2023 to 10 February 2023;
From 11.00 p.m. to 6.00 a.m. on the following day from 13 February 2023 to 17 February 2023 and
From 11.00 p.m. to 6.00 a.m. on the following day from 20 February 2023 to 24 February 2023

The slow lane of West Kowloon Highway southbound from a point about 495 meters north of its junction with Lai Cheung Road (near Olympian City Two) to a point about 890 meters north of the same junction (near HSBC Centre).


        Appropriate traffic signs will be erected on site to guide motorists.

LAW Shuk-pui, Rosanna Commissioner for Transport