Motorists are advised that to facilitate implementation of toll waiver at the Tseung Kwan O Tunnel (TKOT), temporary traffic arrangements will be carried out in phases in the vicinity of the TKOT Toll Plaza from 10.30 pm on 10 December 2022:
Implemented Date and Time |
Traffic Arrangement |
Around 10.30 pm – 11.15 pm on 10 December 2022 |
Some toll booth lanes at the Tseung Kwan O Tunnel Toll Plaza (Kowloon Bound) will be temporarily closed. |
Around 11.15 pm – 11.55 pm on 10 December 2022 |
Some toll booth lanes at the Tseung Kwan O Tunnel Toll Plaza (Kowloon bound & Tseung Kwan O bound) will be temporarily closed. |
Around 11.55 pm on 10 December 2022 – |
Tseung Kwan O Tunnel will be temporarily closed to all vehicular traffic. |
From around 00.10 am on 11 December 2022 |
Motorists can drive through the original Tseung Kwan O Tunnel Toll Plaza without stopping and paying toll. Some traffic lanes of the original Tseung Kwan O Tunnel Toll Plaza will be closed until further notice. |
The Transport Department anticipated that the traffic in the vicinity of the TKOT will be very congested during that period. Members of the public are advised to use public transport or railway services for travelling to/from Kowloon and Tseung Kwan O. Motorists should allow sufficient travelling time, consider using alternative routes, exercise tolerance and patience, and follow the instructions of on-site staff.
For details, please visit the TD's website or the "HKeMobility" mobile app.