Traffic Advice
Temporary Closure of Cycle Track / Footway along
Tseung Kwan O Waterfront Park and Tong Yin Street,
Tseung Lam Highway and Cross Bay Link, Tseung Kwan O

          Members of the public are advised that to facilitate the The HKIE Fundraising Cycling & Run, the following sections will be temporarily closed on 11 March 2023 (Saturday):

(i) from 7.30 am to 8.45 am for the section of cycle track / footway along Tseung Kwan O Waterfront Park (near Tseung Kwan O South Landing) and Tong Yin Street; and
(ii) from 7.30 am to 10.30 am for the section of cycle track / footway along Tseung Lam Highway (near Tong Yin Street) leading to Cross Bay Link and Cross Bay Link.


          Cyclists and pedestrians may use the cycle track / footway along Tong Yin Street, Chi Shin Street, Tong Chun Street, Yee Ming Path, Tseung Kwan O South Waterfront Promenade, Tseung Kwan O Waterfront Park (the section of Tseung Kwan O South Landing to Tseung Kwan O Waterfront Park footbridge (Northern bridge)) and the Northern bridge during the above-mentioned period.

          Appropriate traffic signs will be erected on site to guide the cyclists and pedestrians.