Traffic Advice
Temporary Traffic Arrangements on Tsing Sha Highway
To facilitate road works, motorists are advised that the following temporary traffic arrangements will be implemented on Tsing Sha Highway:
|
Date and Time |
Location |
| (i) |
From 11.00 pm to 05.00 am of the following day daily from 5 December 2023 to 27 December 2023 |
Parts of the traffic lanes of Tsing Sha Highway (Airport bound) from the eastern bridge tower of Stonecutters Bridge to a point about 1.2 kilometres east of the same bridge tower will be temporarily closed. |
| (ii) |
From 11.00 pm to 05.00 am of the following day daily from 13 December 2023 to 10 January 2024 |
Parts of the traffic lanes of Tsing Sha Highway (Airport bound) from a point about 940 metres east of the eastern bridge tower of Stonecutters Bridge to a point about 3.1 kilometres east of the same bridge tower will be temporarily closed. |
| (iii) |
From 11.00 pm to 5.00 am of the following day daily on 5, 8, 10, 12, 15 and 17 January 2024 |
Parts of the traffic lanes of Tsing Sha Highway (Kowloon bound) from a point about 330 metres west of the tunnel tube entrance of Nam Wan Tunnel to a point about 1.5 kilometres east of the same tunnel tube entrance will be temporarily closed. The speed limit of Nam Wan Tunnel (Kowloon bound) will be temporarily adjusted from 80 kilometres per hour to 50 kilometres per hour. |
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.