The section of subway cum cycle track (Subway No. NS316) between San Tin Public Transport Interchange and Castle Peak Road – Chau Tau Section and the sections of at-grade footpath in the vicinity will be temporarily closed to all cyclists and pedestrians.
(II) Cycle Track and Footpath Arrangements
Affected cyclists and pedestrians at the concerned subway cum cycle track (Subway No. NS316) between San Tin Public Transport Interchange and Castle Peak Road – Chau Tau Section and the sections of at-grade footpath in the vicinity may use the temporary cycle track connecting and existing footpath between San Tin Public Transport Interchange and Castle Peak Road – Chau Tau Section.
Appropriate traffic signs will be erected on site to guide the cyclists and pedestrians. For the sake of safety of road users, cyclists are required to dismount upon entering / leaving the above-mentioned cycle track at the existing crossing.
LEE Chung-yan, Angela Commissioner for Transport