Traffic Advice
Temporary Traffic Arrangements on Cheung Tsing Tunnel


       Motorists are advised that in order to facilitate the system replacement works at Cheung Tsing Tunnel, the following temporary traffic arrangements will be implemented during the period below:

Date

Time

Tunnel Tube Closure*

Traffic Arrangements*

From 1 February 2024 to 30 April 2024 (Except public holidays)

Every Tuesdays, Thursdays and Saturdays

From 12.01 midnight to 6.00 am daily

Airport bound tunnel tube

One-tube-two-way operation will be implemented in Kowloon bound tunnel tube

Every Wednesdays, Fridays and Sundays

Kowloon bound tunnel tube

One-tube-two-way operation will be implemented in Airport bound tunnel tube

*The Control Area Operator may vary the tunnel tube closure on a particular day according to the actual needs, and implement corresponding traffic arrangement

       Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.