Notice is hereby given that the following special traffic and public transport arrangements will be implemented from 16 March 2024 (Saturday) to 17 March 2024 (Sunday) to facilitate the holding of Cycle for Millions 2024:
I. TRAFFIC ARRANGEMENTS
From 8.00 p.m. on 16 March 2024 to about 1.00 p.m. on 17 March 2024, the following road will be closed to all vehicular traffic:
From 1.00 a.m. to about 1.00 p.m. on 17 March 2024, the following roads will be closed to all vehicular traffic:
From 1.00 a.m. to about 10.30 a.m. on 17 March 2024, the following road will be closed to all vehicular traffic:
During the period of road closures, the following traffic diversion arrangements will be implemented:
|
Routes |
Direction |
Diversion before resuming normal routing
|
|
CTB A10, A11, A12, A22, A25 and NA11 |
to Hong Kong Island / Kowloon |
via Cheung Tsing Highway (eastbound), Cheung Tsing Tunnel (eastbound) and Tsing Kwai Highway (southbound). |
|
CTB A10, A11, A12, A17, A22, A25, NA11 and NA12 |
to Airport / HZMB Hong Kong Port |
via Tsing Kwai Highway (northbound), Cheung Tsing Tunnel (westbound) and Cheung Tsing Highway (westbound). |
|
LW A41, A41P, A42 and A47X |
to Shatin / Ma On Shan / |
via Cheung Tsing Highway (eastbound), Cheung Tsing Tunnel (eastbound), Tsing Kwai Highway (southbound), slip road and Ching Cheung Road (northbound). |
|
LW A41, A41P, A42, A46 and A47X |
to Airport / HZMB Hong Kong Port |
via Ching Cheung Road (southbound), slip road, Tsing Kwai Highway (northbound), Cheung Tsing Tunnel (westbound) and Cheung Tsing Highway (westbound). |
| LW NA47 |
to Tai Po |
via North West Tsing Yi Interchange (northbound), Tsing Yi North Coastal Road (eastbound), Tsing Tsuen Road (eastbound), Texaco Road (northbound), Texaco Road North (northbound), Tsuen Kam Interchange, Cheung Pei Shan Road (eastbound), Shing Mun Tunnel (eastbound), Shing Mun Tunnel Road (eastbound) and Tai Po Road (northbound). |
| LW NA47 |
to Airport / HZMB Hong Kong Port |
via Shing Mun Tunnel Road (westbound), Shing Mun Tunnel (westbound), Cheung Pei Shan Road (westbound), Tsuen Kam Interchange, Texaco Road North (southbound), Texaco Road (southbound), Tsing Tsuen Road (westbound), Tsing Yi North Coastal Road (westbound) and North West Tsing Yi Interchange (southbound). |
|
KMB 49M |
Circular route temporarily terminate at Tsing Yi Station and omit Ching Fu Court |
Terminal will be temporarily changed from Ching Fu Court to Tsing Yi Station. After departing from Tsing Yi Station, divert via Tsing King Road (southbound), Tsing Yi Heung Sze Wui Road (southbound), Tsing Yi Road (southbound), Ching Hong Road roundabout, Tsing Yi Road (northbound) and resumes the original routeing. |
|
KMB 243M |
Truncate to Ching Hong Road and convert to circular route |
via Ching Hong Road (eastbound), roundabout, Ching Hong Road (westbound). |
III. ATTENTION AND APPEAL
Appropriate traffic aids will be erected to guide motorists. The public transport operators will display notices at the stops and inside vehicle compartment to advise passengers of the temporary arrangements.
Members of the public are advised to plan their routes early, use alternate routes and allow more travelling time to cater for unexpected delay. Motorists are advised to drive with care and patience, and follow instructions given by the Police.
LEE Chung-yan, Angela Commissioner for Transport