Transport Department Notice
Temporary Traffic Arrangements
on Lion Rock Tunnel Road, Sha Tin

        Notice is hereby given that in order to facilitate road works, the following temporary traffic arrangements would be implemented between 10.00 pm to 6.00 am of the following day from Mondays to Saturdays (except public holidays) from 25 March to 30 May 2024:

A. From 25 March to 25 April 2024

        The leftmost lane of Lion Rock Tunnel Road southbound from a point about 110 meters south of its junction with Tai Chung Kiu Road to a point about 460 meters south of the same junction will be closed to all vehicular traffic.

B. From 25 March to 30 May 2024

        The rightmost lane of Lion Rock Tunnel Road northbound from a point about 40 meters north of its junction with Sha Tin Road to a point about 160 meters north of the same junction will be closed to all vehicular traffic.

C. From 26 April to 30 May 2024

        The rightmost lane of Lion Rock Tunnel Road southbound from a point about 110 meters south of its junction with Tai Chung Kiu Road to a point about 460 meters south of the same junction will be closed to all vehicular traffic.


        Motorists could still make access to the remaining traffic lane. Appropriate traffic signs will be erected on site to guide motorists.

LEE Chung-yan, Angela Commissioner for Transport