TRAFFIC ADVICE
Temporary Traffic Arrangements on Shing Tai Road, Chai Wan

        Motorists are advised that, to facilitate drainage works, the section of Shing Tai Road outside Heng Fa Chuen Block 32 to 34 will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic from 10.00 am to 4.00 pm daily on Mondays to Fridays (except public holidays) between 30 April and 10 May 2024.

Appropriate traffic signs will be erected on site to guide motorists.