Traffic Advice
Extension of Temporary Traffic and Transport Arrangements on Kung Um Road and Kiu Hing Road, Yuen Long

        Members of the public are advised that, to facilitate the infrastructure works for Yuen Long South First Phase Development, the following temporary traffic and transport arrangements will continue to be implemented from 6.00 a.m. on 17 May 2024 to 6.00 a.m. on 17 September 2024.

(I)     Road Closure

(II)    Banning of Turning Movement
(III)  Road Conversion

(IV)  Traffic diversion

(V)   Temporary Transport Arrangements
        The following temporary transport arrangements will be implemented for N.T. GMB Route No. 39 (Kung Um – Yuen Long (Fung Cheung Road)), 39 Special Service (Kung Um – Yuen Long Station) and 39A (Kung Um Road (near Muk Kiu Tau) – Yuen Long (Kau Yuk Road) (Circular)):

Direction

Temporary Diversions

Temporary GMB Stop Arrangements

Yuen Long

Diverted via the Kung Um Road temporary road northbound before resuming its original routeing

The GMB stop on Kung Um Road near Lung Tin Sewage Pumping Station will be temporarily relocated for about 15 meters northwards.

Kung Um Road

Diverted via Kiu Hing Road temporary road southbound and temporary vehicular bridge near Tin Liu Tsuen westbound before resuming to its original routing.

N/A


        Motorists are advised to drive with utmost care and patience. Appropriate traffic signs and road markings will be set up on site to guide the motorists.