Notice is hereby given that to facilitate the construction works for the Development of Lok Ma Chau Loop, the following temporary traffic and transport arrangements will continue to be implemented daily from 11.00 p.m. to 5.30 a.m. of the following day on any 8 nights between 18 July 2024 and 30 September 2024 (except Fridays, Saturdays, Sundays and Public Holidays):
(I) Road Closure
The slip road leading from San Tin Interchange to Fanling Highway eastbound will be temporarily closed for all vehicular traffic.
Motorists on San Tin Interchange heading for Fanling Highway eastbound are advised to travel via Castle Peak Road - Chau Tau eastbound and Unnamed Road southbound near Pak Shek Au.
(III) Public Transport Services Arrangements
KMB Route Nos. 276B heading for Sheung Shui, N37 heading for Sha Tin, LWB Route No. A43P heading for Fanling and NT GMB Route No. 616S heading for Mong Kok will be diverted via Castle Peak Road - Chau Tau eastbound and Unnamed Road southbound near Pak Shek Au before resuming their normal routing.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care. The public transport operators will display notices to advise passengers of the above temporary arrangements.
LEE Chung-yan, Angela Commissioner for Transport