Motorists are advised that to facilitate trial run, the following temporary traffic arrangements on On Pong Road and On Tai Road will continue to be implemented until 6.00 pm on 30 September 2024:-
The section of On Pong Road from its southern junction with On Tai Road to its northern junction with On Tai Road (the "Section of On Pong Road") will be temporarily converted from two-lane two-way traffic into two-lane one-way clockwise traffic.
All vehicles on On Tai Road southbound will be prohibited from making left turn onto On Pong Road via the southern junction of On Tai Road with On Pong Road.
Appropriate traffic signs and road markings will be erected on site to guide motorists.