Traffic Advice
Temporary Traffic and Transport Arrangements
at Tsuen Kam Interchange, Tsuen Wan
Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented at Tsuen Kam Interchange from 1.00 am to 5.30 pm on 14 and 21 August 2024:
Road Closure and Banning of Turning Movement
The slip road of Tsuen Kam Interchange near Shek Wai Kok Estate will be temporarily closed to all vehicular traffic. All vehicles will be prohibited from making left-turn from Cheung Pei Shan Road westbound onto Tsuen Kam Interchange.
Traffic Diversion
Affected vehicles on Cheung Pei Shan Road westbound heading for Tsuen Kam Interchange will be diverted via Wo Yi Hop Interchange, Sam Tung Uk Road, Yi Pei Chun Road, Shek Wai Kok Road and Wai Tsuen Road.
Temporary Transport Arrangements
LWB Route nos. NA40 and N42A will be diverted via Tsing Sha Highway, Sha Tin Heights Tunnel, Eagle's Nest Tunnel, Tsing Sha Highway, Stonecutters Bridge, Nam Wan Tunnel, Tsing Sha Highway, Cheung Tsing Highway, North West Tsing Yi Interchange and Tsing Ma Bridge before resuming their original routes.
LWB Route nos. NA41 and N42 will be diverted via Chung Ling Road, Tai Po Road, slip road, Tsing Sha Highway, Sha Tin Heights Tunnel, Eagle's Nest Tunnel, Tsing Sha Highway, Stonecutters Bridge, Nam Wan Tunnel, Tsing Sha Highway, Cheung Tsing Highway, North West Tsing Yi Interchange and Tsing Ma Bridge before resuming their original routes.
Appropriate traffic signs will be erected on site to guide motorists.