Motorists are advised that to facilitate road widening works at Sai Sha Road, the section of Sai Sha Road from its junction with the roundabout on Sai Sha Road near Hoi Ying Road to its junction with the unnamed access road leading to Tai Tung will be converted from single two-lane carriageway (i.e. two lanes in total for both bounds) to dual two-lane carriageway (i.e. four lanes in total for both bounds) from 10.00 a.m. on 22 August 2024 onwards.
Appropriate traffic signs will be provided on site to guide motorists.