Motorists are advised that in order to facilitate road works, the section of the slow lane of Fanling Highway northbound from a point about 890 metres south of its junction with Kai Leng roundabout to a point about 390 metres south of the same junction will be temporarily closed to all vehicular traffic from 00.01 am to 05:30 am daily on Mondays to Fridays (except public holidays) between 26 August 2024 and 30 September 2024.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.