Motorists are advised that in order to facilitate road inspection and maintenance works, the following temporary traffic arrangements will be implemented during the periods specified below:
Road Closure Implementation Date and Time | Temporary Traffic Arrangement |
From 9:30pm to 6:00am of the following day daily on 2, 5, 9, 16, 23 and 26 September 2024 | The Zhuhai bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Hong Kong bound tunnel tube. |
From 9:30pm to 6:00am of the following day daily on 4, 11, 12 and 25 September 2024 | The Hong Kong bound tunnel tube of Scenic Hill Tunnel will be temporarily closed to all vehicular traffic; and one-tube-two-way operation will be implemented at the Zhuhai bound tunnel tube. |
Motorists are advised to drive with care and patience. Appropriate traffic sigs will be erected on site to guide motorists.