TRAFFIC ADVICE
Temporary Traffic Arrangements at the Tseung Kwan O Tunnel and Tseung Kwan O Tunnel Road

        Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at the Tseung Kwan O Tunnel and Tseung Kwan O Tunnel Road in the following days:

Date

Time

Traffic Arrangement

10 September 2024

(Tuesday)

From 12.30 am to 5.00 am

Tseung Kwan O Tunnel Tseung Kwan O bound tunnel tube and the slow lane of Tseung Kwan O Tunnel Road (Tseung Kwan O bound) will be temporarily closed

One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube

24 September 2024

(Tuesday)

From 12.30 am to 5.00 am

Tseung Kwan O Tunnel Tseung Kwan O bound tunnel tube and the fast lane of Tseung Kwan O Tunnel Road (Tseung Kwan O bound) will be temporarily closed

One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube


        Motorists are advised to drive with care and patience.  Appropriate traffic signs will be erected on site to guide motorists.