Members of the public are advised that to facilitate drainage works, the section of Sha Ho Road, Sha Tau Kok from a point about 40 metres north of its junction with Shan Tsui Village Road and Sha Tau Kok Road – Shek Chung Au to a point about 250 metres north of the same junction will be temporarily closed to all vehicular traffic from 8 a.m. on 2 January 2025 to 6 p.m. on 1 June 2025.
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.