Traffic Advice
Temporary Traffic Arrangements on Man Kam To Road,
North District


Motorists are advised that, to facilitate drainage works, the fast lane of Man Kam To Road northbound from a point about 600 metres north of its junction with Sha Ling Road to a point about 630 metres north of the same junction will be temporarily closed from 8 a.m. on 15 March 2025 (Saturday) to 6 p.m. on 30 June 2025 (Monday).

Appropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.