Motorists are advised that, to facilitate watermain laying works, a section of Man Kam To Road from a point about 210 metres north of its junction with Fu Tei Au Road to a point about 150 metres north with the same junction, and a section of Man Kam To Road from a point about 20 metres south of its junction with Fu Tei Au Road to a point about 120 metres south with the same junction, will be temporarily converted from three-lane two-way traffic to two-lane two-way traffic daily from 10 p.m. to 6 a.m. of the following day on 2 May (Friday), 3 May (Saturday) and 4 May 2025 (Sunday).
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.