Members of the public are advised that to facilitate watermain laying works, the following temporary traffic arrangements will be implemented on Wah Ming Road:
The following road sections will be temporarily closed to all vehicular traffic during specified period:
a. From 10.00 a.m. to 4.00 p.m. daily between 8 April 2025 and 15 April 2025
Wah Ming Road northbound from a point about 40 metres south of its junction with Wa Mei Path to the same junction.
b. From 10.00 a.m. to 4.00 p.m. daily between 16 April 2025 and 1 May 2025
Wah Ming Road northbound from a point about 30 metres south of its junction with Wa Mei Path to the same junction.
The green minibus (GMB) parking space on Wah Ming Road outside Cheong To House will be suspended from 10.00 a.m. to 4.00 p.m. daily between 8 April 2025 and 1 May 2025. Passengers for NT GMB 502 can continue to use the existing GMB stop outside Cheong To House, Cheong Shing Court.
Appropriate traffic signs and road markings will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.