Motorists are advised that to facilitate pipe replacement works, the following temporary traffic arrangements will continue to be implemented between 10.00 am and 4.00 pm daily on Mondays to Saturdays (except public holidays) from 2 May 2025 to 30 May 2025:
(I) Road Closure
Part of the lane of the section of Tung Cheong Street southbound between Plover Cove Road and Kwong Fuk Road will be temporarily closed. All vehicles on the section of Tung Cheong Street southbound between Nam Wan Road and Plover Cove Road, Plover Clove Road westbound and Plover Clove Road eastbound will be prohibited from entering the section of Tung Cheong Street southbound between Plover Cove Road and Kwong Fuk Road.
(II) Traffic Diversion
The taxi pick-up and drop-off point at Tung Cheong Street southbound between Plover Cove Road and Kwong Fuk Road will be suspended.
Appropriate traffic signs will be erected on site to guide motorists.