Traffic Advice
Temporary Traffic Arrangements on Tai Lin Pai Road and Kwai On Road, Kwai Chung
Motorists are advised that to facilitate drainage works, the following temporary traffic arrangements will be implemented on Tai Lin Pai Road and Kwai On Road, Kwai Chung from 8.00 p.m. to 6.00 a.m. of the following day on Mondays to Saturdays (except Public Holidays) during the period from 19 May 2025 to 31 July 2025:
(I) Lane Closure
The following traffic lanes will be temporarily closed to all vehicular traffic:
- The left lane of Tai Lin Pai Road (southbound) from a point about 25 metres north of its junction with Kwai On Road to a point about 31 metres south of the same junction;
- The right lane of Tai Lin Pai Road (southbound) from a point about 15 metres north of its junction with Kwai On Road to a point about 116 metres north of the same junction;
- The right lane of Tai Lin Pai Road (northbound) from a point about 10 metres south of its junction with Kwai On Road to a point about 25 metres south of the same junction;
- The right lane of Tai Lin Pai Road (northbound) from a point about 30 metres south of its junction with Kwai On Road to a point about 40 metres south of the same junction; and
- The left lane of Kwai On Road (eastbound) from its junction with Tai Lin Pai Road to a point about 46 metres west of the same junction.
(II) Temporary Suspension of Overnight Bus and Coach Parking Spaces
- The overnight bus and coach parking spaces on the eastern kerbside lane of Tai Lin Pai Road from a point about 68 metres north of its junction with Kwai On Road to a point about 92 metres north of the same junction will be temporarily suspended.
Motorists could use the remaining lanes of the above road sections. Appropriate traffic signs will be erected on site to guide motorists.